Friday, November 11, 2011

Word - Update

Today at the site the backfilling has been in progress and the infilling between the retaining wall and the house. There is a lot to consider in this house while doing this work with water and power to the house, drainage lines for foundation water run-off and lines for future downspouts, catch basins installed, gravel over the foundation drains with filter fabric to insure water flows away from the house and the retaining wall.
10/03/2011

Also the slabs were formed for the fireplaces on the main level and connector porch. The flue from the basement fireplace needed to come up and by-pass the firebox of the main floor fireplace so again, a lot of complicated figuring out the details to make sure the everything fits in the space allotted.
11/11/2011