Thursday, November 3, 2011

Word - HVAC

Today at the site I had to meet with the HVAC subcontractor to go over the possible layout of the system so that he could determine the cost of the system and we could find out where we would need to drop ceilings, create duct chases, put floor registers and return air ducts, set the air conditioning units and set the HVAC units. The codes on HVAC duct work have changed fairly recently that increased the amount of insulation on the duct which in turn created more difficulty in hiding the ductwork.

While I was there I reviewed the rockwork which is looking great, looked over the basement fireplace that passed inspection today and looked at the building of the kitchen screen porch room. Everything is looking great. We wanted to get some backfilling done but an early rain has delayed that work for now.