Kurnick - Septic evaluation
I'm starting to build a new project today. To begin, I visited the lot with the health department employee to evaluate the lot and determine if the current three bedroom septic system that was originally permitted for the lot can be increased to a four bedroom septic field. To give you a little history, the lots were divided up and evaluated for a standard three bedroom septic field in order for the developer to sell the lot but my client's house plan is for a four bedroom septic field so the evaluation needed to be redone. We were lucky in that my clients soil conditions and lot size were perfect for allowing an increase in the septic field size.