Saturday, November 12, 2011
Komara - Siding
We started to install the siding. The pattern that I like to do is a little complicated in that it is a mix of horizontal planks, board & batten and a third material that is either cedar shakes or poplar bark. I like to mix materials to give a depth and character to the home. It is one way to make a simple structure more unique. For this house we use a cedarmill hardiboard material for most of the siding, wood for the trims and we will be using poplar bark for the accent areas.
Posted by
smooreco
Labels:
Komara,
Renovation,
Siding
Friday, November 11, 2011
Word - Update
Today at the site the backfilling has been in progress and the infilling between the retaining wall and the house. There is a lot to consider in this house while doing this work with water and power to the house, drainage lines for foundation water run-off and lines for future downspouts, catch basins installed, gravel over the foundation drains with filter fabric to insure water flows away from the house and the retaining wall.
Also the slabs were formed for the fireplaces on the main level and connector porch. The flue from the basement fireplace needed to come up and by-pass the firebox of the main floor fireplace so again, a lot of complicated figuring out the details to make sure the everything fits in the space allotted.
Posted by
smooreco
Labels:
Custom Home,
Word
Thursday, November 3, 2011
Word - HVAC
Today at the site I had to meet with the HVAC subcontractor to go over the possible layout of the system so that he could determine the cost of the system and we could find out where we would need to drop ceilings, create duct chases, put floor registers and return air ducts, set the air conditioning units and set the HVAC units. The codes on HVAC duct work have changed fairly recently that increased the amount of insulation on the duct which in turn created more difficulty in hiding the ductwork.
While I was there I reviewed the rockwork which is looking great, looked over the basement fireplace that passed inspection today and looked at the building of the kitchen screen porch room. Everything is looking great. We wanted to get some backfilling done but an early rain has delayed that work for now.
While I was there I reviewed the rockwork which is looking great, looked over the basement fireplace that passed inspection today and looked at the building of the kitchen screen porch room. Everything is looking great. We wanted to get some backfilling done but an early rain has delayed that work for now.
Posted by
smooreco
Labels:
Custom Home,
Word
Tuesday, November 1, 2011
Word - Update
The mechanical phase can be a difficult time for clients to make decisions. Mechanicals are important and not something that most people feel comfortable making decisions about or understanding and there are a lot of decisions to make. It is wise for the client to try to educate themselves to the different types of heating/cooling systems available. It's never too soon to start to think about this phase of the job so as soon as you know you are going to build a new house you should take the time to read about your heating and cooling, water heaters and even lighting options.
Posted by
smooreco
Labels:
Custom Home,
Word
Kurnick - Preconstruction work
I've been waiting on the client to get his construction loan in place so that we can start the foundation work. In the meantime, I took the plans into the building department for plan review and to obtain a permit. I also had Duke Power evaluate the power situation. There are two power transformers that my client could tap into, one closer than the other but I wasn't sure if there is a tap-in position available in the closer transformer, luckily there is so we are going to set a temporary power pole next to that transformer and then I will need to call in to inspect the temporary power pole. Once that is approved, we can get a power connection. While we wait on the inspection we will get a jobsite box set up with the permit in place and a port-o-john. Those things need to be in place before the inspection.
Posted by
smooreco
Labels:
Custom Home,
Kurnick,
Preconstruction
Thursday, October 27, 2011
Word - Deck Stairs
The stairs off of the back deck/connector is very complicated. In order to keep within the natural looking theme we decided to use locust post and locust 1/2 tree treads. We stripped the trees of their bark because the locust trees were cut in the summer and that often means that the bark will likely fall off over the course of a year anyway. The trees will get treated with a solution to gray them down to a more weathered look. Locust wood is a good wood to use outside and exposed to the elements the wood is so dense and resistant to decay. They are also - heavy! Getting the trees cut down out of the woods, hauled to a truck, in the truck, to the jobsite, out of the truck, to the site location where they will be installed, stripped and installed, requires a lot of man power and should not be taken for granted. Using natural products usually has a hassle factor that you don't have when you go to the lumberyard and pick up a 2x but the look is undeniably unique.
Posted by
smooreco
Labels:
Custom Home,
Deck,
Word
Wednesday, October 26, 2011
Word - Rockwork
The client and I discussed the look we both wanted to achieve for the rockwork on the outside of the house and we were on the same page from the very beginning, wanting the rock to look very natural, organic and rustic. The rock I selected is a local stone and not typically used for this application but I wanted a chunky feel and I think my mason's are doing a wonderful job in executing the vision. Dealing with rockwork is not an easy task, especially on this job. As I've mentioned in past entries this particular site is very limited on staging areas and space. Rock needs to be delivered and staged as close to the area that it will be installed as possible, moving rock around the site is not much fun for anyone. Not only do you have to consider the rock pile but also a pile of sand and the pallet of mortar, all should be placed as close to the area that it will be installed if possible.
Posted by
smooreco
Labels:
Custom Home,
Rockwork,
Word
Sunday, October 23, 2011
Word - Siding
The client decided to construct awnings over the windows on the backside of the house to eliminate the sun heating up the house during the peak of the day in the summer. We had to come up with a detail that would be in keeping with the look of the rest of the house. I had a local sawmill mill the timber to a specific size to fit the look I wanted to achieve. He also milled 1" material for the roof sheeting. The awnings were then installed, knotched around siding and flashed properly to insure no future water intrusion. Whenever you add details to the outside of the house you invite a potential for water to find a way in or sit on a surface and cause rot. it is important to always think about those details when designing those special elements on the house.
Posted by
smooreco
Labels:
Custom Home,
Siding,
Word
Wednesday, October 19, 2011
Komara - Windows
We have installed most of the windows and doors for the house. I usually specify a window that is aluminum clad outside and pine wood inside. I like the aluminum clad because in my opinion it is one of the most weather resistant materials to use. We have temperatures here that can swing from hot to cold (more cold then hot) and the aluminum clad hold up to temperature changes and retains the color well with very little fading. I also like to use a casement window vs. a double hung. There are occasions that a double hung is preferred, like space issues outside if a window opens up to a deck, but a casement window is more energy efficient than a double hung.
Posted by
smooreco
Labels:
Framing,
Komara,
Renovation
Komara - Framing
For the carport in the front of the house we used locust post as our support. The client wanted the front of the house to reflect the fact that it's build in the mountains. Locust is a tree with a dense wood grain and is one of the most weather resistant woods to use in it's natural state in our area. Most of the time, clients like to see the bark on the wood when used outside but unless the locust tree is cut when the sap is down, which means colder weather, the bark is likely to fall off the tree after a year or so.
Attic trusses were used to frame the roof of the carport. An attic truss is built with a larger bottom cord to allow for the additional weight of items being stored or someone walking on the floor. The area in the middle of an attic truss is left open for storage. This type of truss is more expensive than a standard truss with no center opening or beefed up bottom cord.
Attic trusses were used to frame the roof of the carport. An attic truss is built with a larger bottom cord to allow for the additional weight of items being stored or someone walking on the floor. The area in the middle of an attic truss is left open for storage. This type of truss is more expensive than a standard truss with no center opening or beefed up bottom cord.
Posted by
smooreco
Labels:
Framing,
Komara,
Renovation
Thursday, October 13, 2011
Komara - Framing
The handrail on the back deck is a standard 2x2 picket with top and bottom rails but the client wanted something special inside the screen porch area so for that section of handrail we used mountain laurel pickets. Mountain laurel is a natural growing flowering shrub in our region and the wood is very dense. The shrub is all over but typically if any laurel is growing on a lot that I am clearing, I have it cut down first and stacked to be used inside the house if the client chooses to use that detail. Cutting the laurel is very hard, the wood is dense and the branches are curvy so if you haven't worked with it before it can be dangerous to cut if the blade binds up as your cutting the wood.
Posted by
smooreco
Labels:
Framing,
Komara,
Renovation
Wednesday, October 12, 2011
Word - Retaining Walls
We had to form and pour retaining walls in front of the house to hold back the driveway and parking area from the front yard of the house. The site was so steep that we had to find a "happy medium" elevation so there were not to many steps down to the backyard or out the front door up to the parking. If we had pulled the house entry level with the driveway it would have required nearly 10-12 steps out of the basement door and onto the backyard. We tried to split the difference by stepping down to the front door from the driveway 5 or 6 steps and then out of the basement door 5 steps to the back. That did create the extra cost of the additional retaining wall since typically the house basement wall usually doubles as a retaining wall for the parking. In addition we needed to incorporate a way to get down the the existing path to the guest cabin and a level walkway to the screen porch from the front yard.
Having to consider all of these aspects as well as how the power lines, water lines, gas lines and downspout and water drainage will work it's way around or through the retaining wall is something that must be very well planned and executed before the pour. It took several meetings with the concrete guy, my brother and my main crew leader on the job to make sure everything had been considered. The retaining wall was engineered and inspected before pouring.
Posted by
smooreco
Labels:
Concrete,
Custom Home,
Word
Sunday, October 9, 2011
Komara - Framing
The roof connection of the back porch and house was framed using exposed valley rafters. The client wanted to see that vault in the roofline inside since the fireplace and chimney would be built up the wall toward that porch roof peak. It also allowed us to install two triangle windows on either side of the chimney. Building exposed valley rafters is a more expensive framing technique both in lumber and in labor. The valley rafters use a larger framing member and the labor to cut each rafter with a compound miter is more time consuming.
Posted by
smooreco
Labels:
Framing,
Komara,
Renovation
Friday, October 7, 2011
Kurnick - Clearing the site
The clearing and excavation of the site is being done. Luckily there are not very many big trees on the lot because all of the stumps need to be removed and that can take the most time and they are costly to haul off to a dump site. Usually you have to pay someone to dump your stumps on there site and they dispose of them however they choose, either bury or burn. Stumps can take days and days to burn down so it isn't often something you want to do on site because of time constraints, future trees being damaged by the fire or maybe the development has rules against open burning.
Some of the trees that we took off the site were hickory trees so I did have them hauled down to the local sawmill. If the client is interested we will likely saw them into planks for flooring but I know we will not have enough to do any major section of floor. Also, in order to do this the tree needs to be sawed as soon as possible, stickered and covered to dry out over the course of construction before installation.
Some of the trees that we took off the site were hickory trees so I did have them hauled down to the local sawmill. If the client is interested we will likely saw them into planks for flooring but I know we will not have enough to do any major section of floor. Also, in order to do this the tree needs to be sawed as soon as possible, stickered and covered to dry out over the course of construction before installation.
Posted by
smooreco
Labels:
Custom Home,
Kurnick,
Preconstruction
Wednesday, September 28, 2011
Word - Framing
It took a while of back and forth to decide what the roof of the connector was going to be constructed from, antique beams or lumber that we cut ourselves. Of course we knew that we would save money if we could cut the lumber ourselves or have it cut at the local lumber yard but could we achieve the look we wanted and match the exising antique log cabin that everything has been built around. After several test of lumber scraps and solutions to make the timber look older we decided we wanted to do it ourselves. That allowed the most flexibility and I think the end result was perfect. The color matched the existing log cabin exactly and the look is exactly what we were going for in that it looked like it was built years ago from the materials that were available with local materials. I decided to leave the natural edge on the bottom to give the beams a more authentic look.
Posted by
smooreco
Labels:
Custom Home,
Framing,
Word
Word - Windows
The windows were delivered and installed and true to many other aspects of this job, it wasn't easy. The driver of the truck got stuck before he even made it to the site and then he had to park the truck at the gate of the clients drive. The drive is approx. 800' long, going up a steep incline and then back down to the house site. The hill was too steep for his truck which was not four wheel drive. We had to have my brother there with the flatbed truck to load the windows from the box truck onto the flat bed, haul them to the house and then unload them across a 3' wide walking plank from the drive into the house. The greatroom window was by far the heaviest window and the most scary to manuver over the maze of obstacles. The myriad of potential outcomes that run through my mind the night before is what keeps me up at night. Luckily I work with crews that understand the obstacles and realize how important it is to go slow and treat the materials with care.
Posted by
smooreco
Labels:
Custom Home,
Windows,
Word
Kurnick - Septic install
We started to install the septic field today. It's good to get the septic field in first because it's on the far side of the house so once the foundations are in the path to the side of the house for the septic get's more difficult to access. Thankfully, no hidden surprises of rock so all is well and the septic field and setting of the tank goes in like clockwork. The field and tank need to be inspected by the Jackson County Department of Environmental Health before covering up to ensure all is installed properly
Posted by
smooreco
Labels:
Custom Home,
Kurnick,
Preconstruction
Monday, September 26, 2011
Komara - Framing
Setting the glulam beams that support the roof. I used a structural roof support system called perlins. Perlins support the roof, not at the ridge but down lower on the rafter length which requires two beams instead just one ridge. In this case we were unable to use one ridge because the span was so great to size one ridge beam would have been impossible. The perlins were sized by my supplier's in house engineer. I often feel they over estimate the size of beams like this but if you factor in the cost an engineer charges to size the beam and sign off on the paperwork, the cost difference could be minimal. If the size of the larger beam is a problem then I would suggest getting an engineer to size it because they will likely be more accurate as to what is needed for your specific application.
A crane was used to set the perlin beams. The site is very tight, trees around the house and a narrow drive. There wasn't much room in front of the house to stage the crane and the beams on the truck but we are used to working in difficult circumstances so everyone works together to get the job done and making sure no one gets hurt.
Posted by
smooreco
Labels:
Framing,
Komara,
Renovation
Wednesday, September 14, 2011
Komara - Framing
The exterior stud walls and interior stud walls are going up and properly braced in case we get some heavy winds. The exterior walls are 2x6 studs with 1/2 osb sheathing. All window openings are in with proper headers. We build our headers by sandwiching (2)2x's with sheets of blue board or rigid insulation in the middle. That helps cold air from being able to transfer easily through a solid wood header.
Posted by
smooreco
Labels:
Framing,
Komara,
Renovation
Monday, September 12, 2011
Recession Depression - Material problems
I just got off the phone with my building supplier/engineer, who is sizing some beams for the roof of one of my projects, and he informed me that because of the size of the beams that I need and the lack of production I might have problems getting the beam. The beam is sold by the foot and they have one coming in that is 60' but I don't need 60' I only need 45'. That means I would be paying for 15' that I don't need and the likelihood of getting the beam in size I need quickly is just not going to happen. So, I have to be creative and come up with another alternative or my client will end up spending more money on some beam that they don't need. I miss the days when you could get just about anything you wanted when you wanted it. Today, a contractor has to be even more on top of the job to get things done on time and on budget.
Posted by
smooreco
Labels:
Recession 2011